ANALISIS MINOR INSPECTION PLTGU UNIT 1 PT. PLN NUSANTARA POWER UP BELAWAN TERHADAP PENINGKATAN NILAI EKONOMIS

Penulis

  • Yan Bastian Lumbantobing Universtas Pembangunan Panca Budi
  • Pristisal Wibowo Universtas Pembangunan Panca Budi
  • Zuraidah Tharo Universtas Pembangunan Panca Budi

Kata Kunci:

PLTG, Minor Inspection, Specific Gas Consumption (SGC), Heat Rate, Thermal Efficiency, Net Power Output

Abstrak

This study aims to analyze the impact of minor inspection implementation on increasing the economic value of PLTGU Unit 1 PT. PLN Nusantara Power UP Belawan, in this case PLTGU Unit 1 is the name of the GT 1.1 generator, the limitations of this study are directed at the performance parameters of the generator such as, specific gas consumption (SGC), heat rate, thermal efficiency, and net power output, to determine the impact of minor inspection implementation on increasing economic value. The results of the study showed that after minor inspection, there was a decrease in the specific gas consumption (SGC) value from 0.0120 mmBTU/kWh to 0.0119 mmBTU/kWh, a decrease in the heat rate value from 3,043.85 kCal/kWh to 3,027.76 kCal/kWh, an increase in thermal efficiency from 28.25% to 28.40%, in terms of electrical energy production, there was an increase in net power output from the previous 94,310 kWh to 94,390 kWh, this indicates an increase in net power output which contributes to increasing the availability of electricity supply to the system. Thus, minor inspection has been proven to provide a real contribution to increasing the economic value of the power plant, and is recommended to be carried out routinely according to the maintenance schedule.

Unduhan

Data unduhan belum tersedia.

Referensi

Anisah, S., Bachtiar, R., & Tharo, Z. (2018). Kajian Dampak Limbah-Limbah Listrik (Lampu Penerangan) Terhadap Lingkungan. Teknik Program Studi Elektro, 74–81.

Anzip, A., -, M., Bertha Agustien, S. O., Choirudin, M. F., & Mirwanto, H. (2021). Analisa Pengaruh Turbine Inspection terhadap Kinerja Turbin Gas MW 701D di PLTGU-PT.PJB UP Gresik. Jurnal Nasional Aplikasi Mekatronika, Otomasi Dan Robot Industri (AMORI), 2(1), 1–6.

Darmawan, S., Rahmaniar, & Wibowo, P. (2024). Analisis Perbandingan Kinerja Pembangkit Listrik Tenaga Surya dan. 8(2), 161–174.

Fauziah, S. (2023). Analisis Penyebab Trip Gas Turbine Generator Menggunakan Metode Fta Di Pt. Pertamina Ep Doggi Matindok. Jambura Industrial Review (JIREV), 3(2), 26–35.

Island, nadhifah H. (2017). Kaji Performa Turbin Gas Sebelum Dan Setelah Overhaul Combustion Inspection Di Gtg Utilitas I Pabrik Pt . Petrokimia Gresik Kaji Performa Turbin Gas Sebelum Dan Setelah Overhaul Combustion Inspection Di Gtg Utilitas I Pabrik Pt . Petrokimia Gresik. 1–67.

Mahfuzah, N., Tara Difpa, S., & Ibrahim, H. (2024). Perawatan Turbin Sebelum Dan Sesudah Combustion Inspection Di Pembangkit Tenaga Listrik Gas. SINERGI POLMED: Jurnal Ilmiah Teknik Mesin, 5(1), 21–30.

Nabilah, V., & Marpaung, R. S. (2022). Analisis Pengaruh Pemeliharaan Komponen Pltg Terhadap Unjuk Kerja Turbin Gas Pt Pln Updk Belawan. Konferensi Nasional Sosial Dan Engineering Politeknik Negeri Medan, 1047–1055.

Noer, M. (2017). Analisa Pengaruh Pembebanan Terhadap Efisiensi Generator Di Pltg Borang Dengan Menggunakan Software Matlab. Jurnal Ampere, 2(2), 103.

Pambudyantho, G., Pembimbing, D., Teknologi, D. M., Keahlian, B., Proyek, M., Bisnis, F., & Manajemen, D. A. N. (2018). listrik tenaga gas siklus gabungan dengan clean development mechanism.

Prabowo, A., Lubis, Z., & Tharo, Z. (2024). Studi Analisis Pemanfaatan Tenaga Listrik Di Pabrik Kelapa Sawit. IX(4), 10444–10450.

Prasetiyo, R., Bismantolo, P., Suandi, A., Studi, P., Mesin, T., Bengkulu, U., Supratman, J. W. R., & Limun, K. (2021). maintenance pada combustion section turbin gas unit 2 pltgu Maintenance on the Combustion Section Gas Turbine of Unit 2 Gas & Steam Power Plant PLTGU. 5(2), 9–18.

Siregar, C. T. N., Kindangen, P., & Palandeng, I. D. (2022). Evaluasi Pemeliharaan Mesin dan Peralatan Produksi PT. Multi Nabati Sulawesi (MNS) Kota Bitung. Jurnal EMBA : Jurnal Riset Ekonomi, Manajemen, Bisnis Dan Akuntansi, 10(3), 428.

Sugandi, B., Atabiq, F., & Asti R. A. (2023). Pengaruh Beban Gas Turbine Generator terhadap Efisiensi Heat Recovery Steam Generator pada Pembangkit Listrik Tenaga Gas Uap (PLTGU). ELKOMIKA: Jurnal Teknik Energi Elektrik, Teknik Telekomunikasi, & Teknik Elektronika, 11(3), 639.

Thommi Haposan. (2008). Perbaikan Faktor Tingkat Kesiapan Pembangkit Pada Pt. X Dengan Metode Benchmarking Tesis.

Ummah, M. S. (2019). Studi Perubahan Beban Listrik Terhadap Efisiensi Pembangkit Listrik Tenaga Gas (PLTG) PT. PLN (Persero) Wilayah Sulawesi selatan. Sustainability (Switzerland), 11(1), 1–14.

Unduhan

Diterbitkan

03-06-2025

Cara Mengutip

Yan Bastian Lumbantobing, Pristisal Wibowo, & Zuraidah Tharo. (2025). ANALISIS MINOR INSPECTION PLTGU UNIT 1 PT. PLN NUSANTARA POWER UP BELAWAN TERHADAP PENINGKATAN NILAI EKONOMIS . Jurnal Nasional Teknologi Komputer, 5(3), 182–196. Diambil dari https://publikasi.hawari.id/index.php/jnastek/article/view/206

Terbitan

Bagian

Artikel