ANALISIS PERENCANAAN PLTS SEBAGAI SUPPLY ENERGI LISTRIK CHARGE STATION DI BRANDA CAFE UNIVERSITAS PEMBANGUNAN PANCA BUDI

Penulis

  • Muhammad Farijal Universitas Pembangunan Panca Budi
  • Pristisal Wibowo Universitas Pembangunan Panca Budi
  • Dino Erivianto Universitas Pembangunan Panca Budi

Kata Kunci:

PLTS, charge station, solar energy, renewable energy, campus.

Abstrak

availability of sustainable electrical energy is an essential requirement in the campus environment, particularly to support academic activities of students and academic staff in the use of electronic devices such as mobile phones and laptops. Currently, charge station facilities generally rely on conventional electrical energy supplied by the national grid, which has limitations and causes environmental impacts. Therefore, the utilization of renewable energy is an alternative solution that needs to be developed. This study aims to analyze the planning of a Solar Power Plant (Photovoltaic System) as a source of electrical energy for charge stations at Branda Cafe, Universitas Pembangunan Panca Budi. The research method employed is a quantitative descriptive approach, which includes analysis of daily electrical energy demand, charge station design planning, calculation of the number and capacity of solar panels, battery capacity planning, and selection of supporting PLTS components such as solar charge controllers and inverters. The results show that the total daily electrical energy demand of the charge station is 3,600 Wh. To meet this demand, the PLTS system is designed using nine 100 Wp solar panels, three 12 V 100 Ah batteries, one MPPT-type solar charge controller, and a 5,000 W inverter. The designed PLTS system is capable of providing a reliable, independent, and environmentally friendly electricity supply. Thus, the implementation of PLTS-based charge stations on campus can serve as an alternative solution to support sustainable renewable energy.

Unduhan

Data unduhan belum tersedia.

Referensi

Akhir, P., & Nugroho, D. (2024). Pemilihan komponen utama pada plts kapasitas 2200 wp di polman bandung berdasarkan optimasi kinerja untuk charging station ev menggunakan metode smart.

Alternatif, E., Di, C. V, Terdampak, D., Semeru, B., Nugroho, A., Santosa, T., Hani, S., & Santoso, G. (2022). PERANCANGAN SISTEM PLTS OFF-GRID KAPASITAS 100 WP SEBAGAI SUMBER. November.

Boedoyo, M. S., Teknologi, P., & Energi, S. (n.d.). Potensi dan peranan plts sebagai energi alternatif masa depan di indonesia.

Goeritno, A., Maulana, M. A., & Shulhan, F. (2023). Pemasangan Solar Panel untuk Sistem Charging Power Station di Kawasan Ekowisata Gunung Kuta , Kabupaten Bogor. 2, 82–97.

Putra, N. A., Yusron, M., Pratiwi, W. A., Ratu, D. S., & Made, I. (2025). Perancangan dan Analisis Tekno-Ekonomi Solar Carport untuk Suplai Beban Auxiliary pada Main Station Building PLTS Sengkol. 4(4), 4309–4317.

Rosa, Y., Teknik, P., Berat, A., Padang, P. N., Mesin, P. T., Padang, P. N., Limau, K., Kecamatan, M., & Kota, P. (2023). Pengaruh Sudut Kemiringan dan Orientasi Solar Cell Terhadap Luaran Energi Listrik Sebagai Kajian Power Charge Station untuk Kendaraan Alat Berat. 25(1), 9–16.

Setyawan, A. (2022). PEMBANGKIT LISTRIK TENAGA SURYA OFF GRID UNTUK SUPPLY CHARGE STATION. 1, 23–28.

Teknik, J., & Politeknik, K. (2021). Jurnal Reaksi (Journal of Science and Technology) Jurusan Teknik Kimia Politeknik NegeriLhokseumawe Vol. 19 No.01, Juni 2021 ISSN 1693-248X. 19(01).

Akhir, P., & Nugroho, D. (2024). Pemilihan komponen utama pada plts kapasitas 2200 wp di polman bandung berdasarkan optimasi kinerja untuk charging station ev menggunakan metode smart.

Alternatif, E., Di, C. V, Terdampak, D., Semeru, B., Nugroho, A., Santosa, T., Hani, S., & Santoso, G. (2022). PERANCANGAN SISTEM PLTS OFF-GRID KAPASITAS 100 WP SEBAGAI SUMBER. November.

Boedoyo, M. S., Teknologi, P., & Energi, S. (n.d.). Potensi dan peranan plts sebagai energi alternatif masa depan di indonesia.

Goeritno, A., Maulana, M. A., & Shulhan, F. (2023). Pemasangan Solar Panel untuk Sistem Charging Power Station di Kawasan Ekowisata Gunung Kuta , Kabupaten Bogor. 2, 82–97.

Putra, N. A., Yusron, M., Pratiwi, W. A., Ratu, D. S., & Made, I. (2025). Perancangan dan Analisis Tekno-Ekonomi Solar Carport untuk Suplai Beban Auxiliary pada Main Station Building PLTS Sengkol. 4(4), 4309–4317.

Rosa, Y., Teknik, P., Berat, A., Padang, P. N., Mesin, P. T., Padang, P. N., Limau, K., Kecamatan, M., & Kota, P. (2023). Pengaruh Sudut Kemiringan dan Orientasi Solar Cell Terhadap Luaran Energi Listrik Sebagai Kajian Power Charge Station untuk Kendaraan Alat Berat. 25(1), 9–16.

Setyawan, A. (2022). PEMBANGKIT LISTRIK TENAGA SURYA OFF GRID UNTUK SUPPLY CHARGE STATION. 1, 23–28.

Teknik, J., & Politeknik, K. (2021). Jurnal Reaksi (Journal of Science and Technology) Jurusan Teknik Kimia Politeknik NegeriLhokseumawe Vol. 19 No.01, Juni 2021 ISSN 1693-248X. 19(01).

Unduhan

Diterbitkan

30-04-2026

Cara Mengutip

Muhammad Farijal, Pristisal Wibowo, & Dino Erivianto. (2026). ANALISIS PERENCANAAN PLTS SEBAGAI SUPPLY ENERGI LISTRIK CHARGE STATION DI BRANDA CAFE UNIVERSITAS PEMBANGUNAN PANCA BUDI. Jurnal Nasional Teknologi Komputer, 6(2), 894–905. Diambil dari https://publikasi.hawari.id/index.php/jnastek/article/view/421

Terbitan

Bagian

Artikel